91九色偷拍丰满50路熟女,欧美AAA在线片,国产精品观看三区,18禁在线播放无码

歡迎訪問永誠廣建公路材料(山東)有限公司網站!

永誠廣建公路材料(山東)有限公司

熱線電話

15165180688

您現(xiàn)在所在的位置 :首頁 - 新聞中心 > 行業(yè)資訊

行業(yè)資訊

加纖維瀝青混凝土的拌和要求

來源:http://m.piao.sd.cn/ 日期:2022-12-19
加纖維瀝青混凝土的施工方法與傳統(tǒng)瀝青混凝土的施工基本相同,分為進場材料檢驗、拌和設備的選型、拌和、攤鋪和碾壓一個工序進行,下面濟南瀝青混凝土生產廠家就來講講加纖維瀝青混凝土的拌和要求。
The construction method of fiber reinforced asphalt concrete is basically the same as that of traditional asphalt concrete, which is divided into one process: inspection of incoming materials, selection of mixing equipment, mixing, paving and rolling. Next, Jinan asphalt concrete manufacturer will talk about the mixing requirements of fiber reinforced asphalt concrete.
1、確定每盤熱料倉的配合比,計算出每盤混合料的質量,根據目標配合比確定的纖維用量計算每盤混合料中投放的纖維質量,然后按此質量對進場的纖維進行分裝,包裝袋采用市場上常見的聚乙烯塑料袋即可。分裝過程中,保證稱量的準確性。纖維的摻加如示意圖:
1. Determine the mix proportion of each tray of hot material bin, calculate the quality of each tray of mixture, calculate the quality of fiber put into each tray of mixture according to the fiber consumption determined by the target mix proportion, and then pack the incoming fibers according to this quality. The packaging bags can be polyethylene plastic bags commonly used in the market. Ensure the accuracy of weighing during subpackaging. The addition of fiber is shown in the schematic diagram:
2、瀝青混合料應按設計瀝青用量進行試拌,試拌后取樣進行馬歇爾試驗,并將其試驗值與室內配合比試驗結果進行比較,驗證設計瀝青用量的合理性,必要時可作適當調整:
2. The asphalt mixture shall be trial mixed according to the design asphalt dosage. After trial mixing, samples shall be taken for Marshall test, and the test value shall be compared with the indoor mix proportion test results to verify the rationality of the design asphalt dosage. If necessary, appropriate adjustments can be made:
濟南瀝青混凝土
3、確定適宜的拌和時間。對于普通的瀝青混合料,間歇式拌和設備每盤拌和時間為30~60秒,推薦的拌和時間為干拌25~30秒,濕拌30秒,以混合料拌和均勻,纖維和瀝青混合料裹覆良好為準;
3. Determine the appropriate mixing time. For ordinary asphalt mixture, the mixing time of each batch of intermittent mixing equipment is 30-60 seconds. The recommended mixing time is 25-30 seconds for dry mixing and 30 seconds for wet mixing. The mixture shall be evenly mixed and the fiber and asphalt mixture shall be well coated;
4、確定適宜的拌和與出廠溫度。瀝青(均指石油瀝青,下同)的加熱溫度宜為130℃~160℃,加熱不宜超過6小時,且當天加熱宜當天用完,不宜多次加熱,以免老化砂石加熱溫度為140℃~170℃,礦分不加熱。瀝青混合料的出廠溫度宜為130℃~160℃,當使用改性瀝青時,應比上述溫度的高限再提高10℃~15℃,纖維的摻加不必進行溫度調整。
4. Determine appropriate mixing and factory temperature. The heating temperature of asphalt (all refer to petroleum asphalt, the same below) should be 130 ℃~160 ℃, and the heating should not exceed 6 hours. The heating should be used up on the same day, and should not be repeated, so as to avoid the heating temperature of aging sand and gravel is 140 ℃~170 ℃, and the mineral is not heated. The factory temperature of asphalt mixture should be 130 ℃~160 ℃. When modified asphalt is used, it should be 10 ℃~15 ℃ higher than the upper limit of the above temperature. It is unnecessary to adjust the temperature when adding fiber.
此外加纖維瀝青混凝土路面成型過程中一般不會形成油斑,顏色外觀與普通瀝青混凝土路面基本相同。更多相關內容就來我們網站http://m.piao.sd.cn進行咨詢了解吧!
In addition, the asphalt concrete pavement with fiber generally does not form oil spots during the forming process, and the color appearance is basically the same as that of ordinary asphalt concrete pavement. More relevant content will come to our website http://m.piao.sd.cn Consult and understand!
  • 上一條:裝載機行駛過程中變速箱“跳”的應急方式
  • 下一條:帶你認識常見的路面機械設備
  • 相關產品:

    欧美激情中文字幕综合一区| 国产码欧美日韩高清综合一区| 成人免费在线视频一区| 嵊州市| 日本少妇精品一区二区| 色悠久久久久综合网伊人| 乐播国产精品一区二区| 欧美高清无砖专区欧美精品| 国产欧美精品一区二区三区,| 免费又黄又粗做受视频| 亚洲免费人成乱码| 亚洲日韩超高清在线| 亚洲影院久久| 亚洲免费欧美多区| 永久在线视频| 国产精品成人在线播放| 亚洲成人福利aaa| 久久免费大龄熟妇视频| 天堂九九天堂综合色| 国产精品99无码一区二蜜臀 | 久久999国产| 熟妇 日韩无码| 无码aⅴ精品一区二区三区浪潮 | 亚洲AV无码一区二区三区网站| 午夜福利电影无码在线| 色欲av无码一区二区三区换脸| 99国产精品一区| 精品无码免费在线观看| 亚洲国产日韩在线欧美综合亚 | 国产精品VA在线观看无码满18| 国产精品老熟女色视频| 国产午夜无码精品电影在线观看 | 欧美日韩精品自在绒| 精品少妇的一区二区三区四区| 欧美高清一区精品| 免费欧美一级精品| 中国熟女高潮精品视频| 91精品一区二区中文字幕| 91久久国产综合精品女同| 国产1024| 精品久久偷拍|